AngMinero
  • Home
  • News
  • Features
  • Business
No Result
View All Result
AngMinero
  • Home
  • News
  • Features
  • Business
No Result
View All Result
AngMinero
No Result
View All Result
Home Business

BABAWI RAW: Philex Mining’s Q1 net income down to P 206 million

AngMinero News by AngMinero News
May 10, 2019
in Business, News
27 1
0
PALIT OPISYALES: Philex Mining appoints new VP, head of legal as former officer resigns
84
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Philex Mining Corporation’s net income declined to P 206 million for the first quarter of 2019 with core net loss standing at P 112 million weighed down by weaker metal production due to declining ore grades.

“As it nears the end of mine life, we have centered efforts on maximizing the remaining cash generation capacity of Padcal,” said Mr. Eulalio B. Austin Jr., President and Chief Executive Officer of Philex Mining, in a press release issued by the company Tuesday, May 7.

According to the press release, Philex Mining only recorded 1.832 million tons of milled output first quarter of 2019. This is lower compared to the 2.197-million ton of milled output the mining firm produces same period last year.

Philex Mining explained that it is a typical occurrence for mining grades to lessen when drawing ore outside of the core of the deposit.

Philex Mining added that the decline on the recent metal output was a result of by unscheduled maintenance of some mining equipment and forest fire incidents around the mine camp that caused power outages and the immediate deployment of operations personnel to aid in fire suppression.

Gold production was at 10,493 ounces and 5.727 million pounds versus previous year’s levels of 17,947 ounces. Copper production, on the other hand, reached 7.073 million pounds.

Compared to $1,338 per ounce and $3.10 per pound last year, gold and copper were at $1,304 per ounce and $2.96 per pound so far this year.

Meanwhile, production cost of the company raised one percent to P1.074 billion from P1.064 billion in the first quarter of 2018 caused mainly by critical mining equipment undergoing periodic.

The mining firm said that it will continue to implement operational enhancement to improve its financial performance in the coming quarters. Philex Mining’s Silangan mine is said to have a financial equity and project financial advisors soon.

Additionally, conclusion of the ongoing definitive feasibility studies by early third quarter of this year is expected from Ausenco, lead technical consultant Australian-based engineering firm tapped by Philex Mining.

toto togel

toto slot

situs togel

sydney night

bento4d

situs slot

bento4d

toto togel

situs togel

slot resmi

slot gacor

togel online

bento4d

toto

togel online

toto slot

situs toto

situs togel

thepubtheatre

situs togel

situs slot

situs toto

slot gacor

toto togel

togel online

situs slot

slot gacor hari ini

togel online

situs toto

slot gacor hari ini

toto slot

bento4d

rtp live

togel online

rtp slot

link slot

toto slot

toto togel

slot resmi

situs hk

toto togel

toto slot

situs toto

toto slot

toto togel

slot online

toto togel

togel online

link gacor

bandar togel

slot gacor hari ini

togel online

situs slot

toto slot

situs gacor

toto slot

pafibulelengkab.org

situs togel

bento4d

situs toto

rtp slot

slot resmi

toto slot

toto slot

toto slot

bento4d

slot gacor

situs toto

situs toto

toto slot

slot gacor hari ini

situs slot

desaparhorboan.id/listing

situs slot

lawrencehealthcenter.com

baselyne.io

hsddonline.com

bandar togel

link slot

rtp slot

slot gacor hari ini

toto togel

link togel

toto slot

link slot

link slot

link gacor

situs slot

link slot

situs togel

link slot

situs toto

link slot gacor

bandar togel

library.iihs.co.in

toto slot

situs slot

slot gacor

togel online

bento4d

toto slot

link slot gacor

link slot gacor

situs gacor

link slot

toto slot

artikel penelitian aceh

situs slot

toto slot

toto slot

bandar togel

situs slot

slot online

slot thailand

slot gacor

toto

situs slot gacor

link togel

slot online

slot thailand

slot gacor hari ini

slot online

bandar togel

link slot

toto slot

slot online

link slot

slot

bandar togel

situs togel

slot gacor

bandar togel

slot gacor hari ini

link togel

slot gacor

slot

slot gacor hari ini

slot gacor

togel

slot online

slot thailand

slot thailand

togel online

toto slot

situs gacor

toto slot

toto slot

link togel

slot online

slot online

situs slot gacor

toto

slot gacor

kfbbinbir.sakarya.edu.tr

toto slot

situs gacor

toto slot

slot gacor hari ini

link slot

toto slot

link slot

slot gacor hari ini

toto slot

situs slot gacor

link slot

situs togel

Tags: AusencoCopperGoldPhilex Mining Corporation

Related Posts

OceanaGold posts USD 438.8M revenue, declares USD 112M in 2025 dividends
News

OceanaGold posts USD 438.8M revenue, declares USD 112M in 2025 dividends

February 19, 2026
Makilala Mining advances Kalinga mining project, eyes Q2 funding
News

Makilala Mining advances Kalinga mining project, eyes Q2 funding

February 19, 2026
DOE launches coal bid round offering 18 blocks, including Semirara areas
News

DOE launches coal bid round offering 18 blocks, including Semirara areas

February 18, 2026
MGB suspends Woggle exploration permit citing force majeure
News

MGB suspends Woggle exploration permit citing force majeure

February 18, 2026
DOE eyes bidding for Semirara contract; SMPC says no formal decision yet
News

DOE eyes bidding for Semirara contract; SMPC says no formal decision yet

February 18, 2026
Silangan enters final commissioning phase before first production
News

Silangan enters final commissioning phase before first production

February 18, 2026

FEATURED POST

OceanaGold posts USD 438.8M revenue, declares USD 112M in 2025 dividends

OceanaGold posts USD 438.8M revenue, declares USD 112M in 2025 dividends

February 19, 2026
Makilala Mining advances Kalinga mining project, eyes Q2 funding

Makilala Mining advances Kalinga mining project, eyes Q2 funding

February 19, 2026
Operational complexity demands smarter study phases in mining —Ausenco’s Chris Pitman

Operational complexity demands smarter study phases in mining —Ausenco’s Chris Pitman

February 19, 2026
DOE launches coal bid round offering 18 blocks, including Semirara areas

DOE launches coal bid round offering 18 blocks, including Semirara areas

February 18, 2026

EDITOR PICK'S

OceanaGold posts USD 438.8M revenue, declares USD 112M in 2025 dividends

February 19, 2026

Makilala Mining advances Kalinga mining project, eyes Q2 funding

February 19, 2026

Operational complexity demands smarter study phases in mining —Ausenco’s Chris Pitman

February 19, 2026

DOE launches coal bid round offering 18 blocks, including Semirara areas

February 18, 2026

MGB suspends Woggle exploration permit citing force majeure

February 18, 2026

‘The Good, the Bad, and the Ugly:’ Enmintech’s Myke Jones weighs UAVs in mining exploration

February 18, 2026

DOE eyes bidding for Semirara contract; SMPC says no formal decision yet

February 18, 2026

Recent News

OceanaGold posts USD 438.8M revenue, declares USD 112M in 2025 dividends

OceanaGold posts USD 438.8M revenue, declares USD 112M in 2025 dividends

February 19, 2026
Makilala Mining advances Kalinga mining project, eyes Q2 funding

Makilala Mining advances Kalinga mining project, eyes Q2 funding

February 19, 2026

Category

  • Business
  • Features
  • News
  • Uncategorized

Follow us

  • Setup menu at Appearance » Menus and assign menu to Footer Navigation

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

No Result
View All Result

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

Login to your account below

Forgotten Password?

Fill the forms bellow to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In